Our
Vision
To
help 6500 middle income families have Solar power in their homes
After 1
yr of negotiations we have a reputable company who is willing to help us.
Our
Contact information :
A Helping Hand (A Non for profit Organization - Helping People to Help them selves)
Phone (760) 383 3040
PeoplePower777 (at) Gmail (dot) com
Information we need from you :
Phone (760) 383 3040
PeoplePower777 (at) Gmail (dot) com
Information we need from you :
Installation
and Warranties provided by :
Narrow Gate Solar Company
Ridgecrest, CA
Specification of the system :
Solar
Panels
Astronergy 255 Watt Polycrystalline Solar Panels
Astronergy 255 Watt Polycrystalline Solar Panels
Micro Inverters incorporated in to the Solar Panel it self (see below for reference
information)
System size will be 1.8 kW and will produce approximately 3500 kWh per year when facing South and can be expanded up to 17 panels with minimal additional electrical work.
Cost
Composition Shingles roof $6525
Tiled Roof $6940
(This is approximately 50% lower than what other vendors would charge)
We will get 30% back as a rebate from the Federal Govt after we submit our taxes
Therefore the final cost is
Composition Shingles roof $4567.50
Tiled Roof $4858
Composition Shingles roof $6525
Tiled Roof $6940
(This is approximately 50% lower than what other vendors would charge)
We will get 30% back as a rebate from the Federal Govt after we submit our taxes
Therefore the final cost is
Composition Shingles roof $4567.50
Tiled Roof $4858
The Process :
Step 1
Commits
customer to the project/install with Narrow Gate Solar Company.
Authorizes
scheduling of physical site survey and actual on site measurements of your roof
for PV modules, placement of inverter, AC disconnect location and connection
required.
Complete
preliminary roof array layout.
Step 2
Generate
full scaled plan set, once customer agrees on panel and equipment layout.
Complete
building department plan review forms and permit package.
Submit
plans to building department for plan review and pay for plan review cost.
City plan
review time can be from a few days to several weeks, varies with their
workloads.
Pull
permits and pay permit fees.
Start
project installation.
Step 3
Project
completed.
Project
tested.
City
Inspector approves project and signs off job card.
Step 4 : No cost
Permission to Operate (PTO) must be obtained from Southern California Edison. Once plans have been approved by the building department there are two documents that will be provided to the customer for completion and then submitted with additional documentation provided by Narrow Gate Solar to Southern California Edison to begin the process (this often reduces the time it takes to receive approval from the utility company). Once the project installation and final inspection are completed Narrow Gate Solar will submit the completed inspection record card (yellow card) to Southern California Edison for final approval. PTO generally takes from two to four weeks from project completion.
References
:
Liabilities and
Warranties :
Please note that by agreeing
to participate in this project, you waive your rights to sue AHH (A Helping
Hand) and the Volunteers of AHH (A Helping Hand) (All they did was to facilitate and coordinate
the initial program)
All Liabilities and
Warranties are provided by the Manufacturer of the products and the Installer – Narrow Gate Solar Company, Ridgecrest, CA
No comments:
Post a Comment